For us, electrical planning does not start at the distribution board – it starts in the building model. PCM-Reichl plans power systems, low-voltage & communications systems, energy supply, lighting and safety systems across service phases 1–9 – for industry, commercial and residential construction. From Lindau (Lake Constance) and Memmingerberg (Allgäu), throughout the DACH region.
Electrical engineering scope: from basic evaluation to post-completion support
The scope of services spans all nine service phases – from the supply concept to the final documentation. We plan low- and medium-voltage distribution, cable routing, lighting including lighting calculations, lightning protection and earthing, as well as data and network systems – coordinated with ventilation ducts, pipe networks and automation systems in the same model.
Our electrical planning is part of coordinated building services (MEP) planning: we plan the interface to building automation & controls in-house – every data point is known before tendering starts.
Power systems, low-voltage systems, safety systems – our planning fields
Whether a building is reliably supplied, safely lit and digitally connected is decided by its electrical planning. Our planning fields cover system groups 4 and 5 of the standard project phases – from the service connection to the network cabinet.
Power systems
Energy supply, low- and medium-voltage distribution, cable routing and lighting installations – sized in the model, with reserves for photovoltaics and EV charging infrastructure.
Low-voltage & communications
Data and network systems, communications technology and the interfaces to building automation – planned in a structured way instead of pulled in as an afterthought.
Safety systems
Emergency lighting, safety power supply, lightning protection and earthing to the relevant DIN and VDE standards – documented ready for inspection by assessors and operators.
What does electrical planning under standard project phases include?
The project phases assign electrical engineering to the technical building equipment: system group 4 covers power installations, system group 5 covers telecommunications and information technology installations (§ 53 HOAI). The scope of services is structured into nine service phases – from basic evaluation to post-completion support.
In concrete terms, this includes: the supply and energy concept, sizing of distribution boards and routes, lighting calculations, bills of quantities for procurement, and specialist site management in service phase 8. Fees are based on eligible costs, the fee zone and the commissioned service phases.
Electrical planning for industry, commercial and residential construction
Every use places its own demands on the electrical systems – we plan to your set of rules, not to a template.
Industry
Security of supply and redundancy for production processes, expansion reserves and robust routing concepts – up to GMP environments, where the depth of documentation is a deciding factor.
Commercial
Office and commercial buildings with efficient lighting, structured cabling and EV charging infrastructure – planned as part of the energy concept, not as an afterthought.
Residential
Cost-effective electrical planning for housing companies and project developers – code-compliant, easy to maintain and without oversized technology.
Specialist site management for electrical works: securing quality on site
Good planning is worth little if nobody on site checks that it is followed. As specialist site management for electrical systems, we continuously check distribution boards, routes and installations against the detailed design – also as a stand-alone mandate for designs by other firms. You will find the full scope of services under site supervision for building services.
Electrical design engineer or electrical contractor – who does what?
The electrical design engineer plans, tenders and supervises – the electrical contractor carries out the work. As an independent engineering consultancy, we produce the design that installing companies use to price and install; we sell neither installation nor materials. That keeps tendering manufacturer-neutral, makes bids comparable and cleanly separates design from execution.
For a private single-family home, the electrical contractor is usually the right contact. Our scope of services is aimed at clients, architects, general planners and companies with commercial projects.
Does PCM-Reichl also plan photovoltaics and EV charging infrastructure?
+
Yes – on request from the very start as part of the energy concept, not as an afterthought. Reserves for PV, charging infrastructure and backup power are sized early: in the distribution boards, the routes and the connected load.
Does PCM-Reichl also take on just the specialist site management for electrical works?
+
Yes. We also take on specialist site management for electrical systems in service phase 8 as a stand-alone mandate – including designs by other firms, when clients or general planners lack the capacity for phase 8.
Does PCM-Reichl work with architects and general planners?
+
Yes, regularly: we deliver specialist electrical planning as part of your design team – on its own or together with HVAC & plumbing and building automation, model-based and in open exchange formats.
In which regions does PCM-Reichl work as an electrical planner?
+
Our focus is on Lake Constance and the Allgäu – from Lindau and Memmingerberg with short distances to Memmingen, Kempten, Ravensburg and Friedrichshafen, and just across the border to Vorarlberg. Depending on the project, we work throughout the DACH region.
Your electrical planner for the Allgäu and Lake Constance
There are quite a few electrical planners between Memmingen and Kempten – an engineering consultancy that plans electrical systems together with HVAC & plumbing and building automation in one model is the exception. That is exactly our difference: interfaces stay in one hand, and for specialist site management and commissioning we are on site quickly – in Lindau, Memmingen, Kempten, Ravensburg or Friedrichshafen, and just across the border in Vorarlberg. More about the region: Building services planning Allgäu & Lake Constance – all services at a glance.
Head office – for projects around Lake Constance.
Branch office – close to industry and commerce between Memmingen and Kempten.
Let’s talk about your electrical planning.
Tell us about your project – you speak directly with the engineer who would plan it.